What the Town of Bradford West Gwillimbury asks for to finish a basement, how the CityView Portal works and what changes for an apartment.
Yes. The Town has a basement finishing permit package, and the CityView Portal takes applications for finished basements and accessory dwelling units.
Not sure? Call the Town's Building Division before you start. Electrical work is reported to the Electrical Safety Authority, not the municipality.
From the Town's basement finishing handout, updated 2026.
Every room with its size, dimensions and ceiling height.
Locations and sizes, including how high each window sits off the floor.
Stair location and size, plus every smoke and CO alarm.
Every plumbing fixture and the mechanical ventilation.
Heat registers in each room and the return air grilles.
The permit application, and a Single Dwelling Unit Declaration if it isn't an apartment.
Applications go in through the Town's CityView Portal as unsecured PDFs.
Upload the drawings and forms, and pay by credit card online.
10 business days for a complete house application.
Downloaded as a PDF, printed and kept on site.
Required at each stage of the work.
For an apartment, registration with Community Planning, about 2 to 3 weeks.

An apartment needs more than a finishing permit. The Town checks zoning, the Building Code, and 3 inspections before it registers the unit.
Yes. The Town has a basement finishing permit package.
Through the CityView Portal, with unsecured PDF files. Paper drawings are still accepted in person.
The Ontario Building Code gives the municipality 10 business days to review a complete application for a house. Comments and resubmissions add time.
A form confirming the house is used as one unit, for basements that aren't apartments.
An apartment goes through zoning, a Building Code review, inspections and registration with the Town.
The Electrical Safety Authority, separate from the Town's building permit.
A site visit shows what your space can hold and what the Town will ask for.