What it costs to finish a basement or build a basement apartment in Bradford West Gwillimbury, and what moves the number.
Rough budgets before HST. The real number comes after a site visit and drawings. Small basements cost more per square foot, and underpinning is priced separately.
The rates above multiplied out, before HST and before any entrance, drawings or underpinning. HST at 13% goes on top.
Treat these as a starting point for a budget, not a quote. A smaller basement usually lands at the high end of the range.
Small basements cost more per square foot, because the stairs, mechanical room and bathroom cost about the same at any size.
New plumbing fixtures go on the permit drawings and often need a new drain line under the slab.
Each bedroom needs a window big enough to get out of, which can mean cutting a bigger opening in the foundation.
Damp walls get fixed before anything is closed in.
An apartment adds fire separation, connected alarms, a way out, inspections and registration.
Low ceilings can mean moving ducts or lowering the floor. Underpinning is priced separately.

Start with a site visit. We measure the space, look at the walls, the ceiling height and the mechanical room, and talk through what you want.
Then come the drawings and a detailed price.
Book a site visit$80 to $120 per sq ft before HST as a rough budget, for a basement that isn't a second unit.
$100 to $150 per sq ft of finished area before HST, plus $10,000 to $30,000 for a separate entrance if needed and $3,500 plus Town fees for drawings.
No. The budgets on this page are before HST.
The stairs, mechanical room, bathroom and permit cost about the same in a small basement as a big one.
No. Underpinning is priced separately.
A site visit shows what your space can hold and what the Town will ask for.