Build or register a second unit in your basement. What the Town checks, what the Building Code asks for and what it costs.
The Town's zoning by-law allows accessory dwelling units in most residential zones, subject to its other rules. A site visit is the fastest way to find out.
Single-detached and semi-detached houses in the R1-1, R1-2, R1-3, R1-4, R2-1, R4 and ER zones.
Parking, the unit's minimum floor area and the maximum floor area are checked against the by-law.
A designer, architect or contractor reviews the space against the Code before anything else.
Bradford West Gwillimbury Fire, the Electrical Safety Authority and the Town's property standards officer.
Every unit gets registered with the Town's Community Planning department. Allow about 2 to 3 weeks.
Houses not on municipal water and sewer use the new-unit checklist, even for an older unit.
For a house more than 5 years old, under the Ontario Building Code. The drawings for your house confirm what applies.
At least 1.95 m (about 6'5") over the living area, and 1.85 m under beams and ducts.
Every bedroom needs a window that opens without tools, with at least 0.35 m² of clear opening and no side under 380 mm.
Type X drywall, 15.9 mm thick, between the units, or an assembly rated for 30 minutes.
Smoke alarms on every level and in every bedroom, all connected. CO alarms near bedrooms if there's a gas furnace or attached garage.
One furnace can serve both units if a duct smoke detector shuts it down when it senses smoke.
Its own exit, such as a side or rear walk-down entrance, or a shared exit that meets the fire separation rules.

The Town has a separate path for units created on or before July 14, 1994 and connected to Town water and sewer.
Rough budgets before HST. The real number comes after a site visit and drawings.
At those rates, an 800 sq ft unit works out to $80,000 to $120,000 before HST, plus an entrance if the house needs one.
We look at the basement, the parking and where an entrance could go.
The zone, parking and floor areas.
Floor plans for the Town. $3,500 plus Town fees.
Through the CityView Portal.
Fire, electrical and building inspections.
With Community Planning, about 2 to 3 weeks.

In most residential zones, in single-detached and semi-detached houses, subject to the zoning by-law.
Yes. Every unit gets registered with the Town's Community Planning department.
About 2 to 3 weeks once the package is complete.
If it was created on or before July 14, 1994 and is on Town water and sewer, there's a separate path with proof of age and 3 inspections.
The unit needs a way out that meets the Building Code. A side or rear walk-down entrance is the most common answer, at $10,000 to $30,000.
Bradford West Gwillimbury Fire, the Electrical Safety Authority and the Town's property standards officer.
A site visit shows what your space can hold and what the Town will ask for.